Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel: 14139001B


Addresses:

9210 E VALENCIA RD


Inspection Status: Passed

Inspection History: TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork

Permit Number - TR-PIA-0824-00011

Inspection Description - TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork

Inspection Status - Passed

Date Description Inspector Results Comments
06/09/2025 TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork Passed Vegetation has been cleared or saved on site.
06/12/2025 TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork Passed Site Inspection still doesn’t have PIA work being done quite yet.
06/18/2025 TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork Passed Soil proctor was picked up day before to be prepared for upcoming densities and curb/sidewalk work.
06/25/2025 TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork Passed No PIA work being done today. Asphalt mat was placed yesterday on site for parking lot. Next step will be prepping subgrade for curb and sidewalk placement.
06/27/2025 TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork Passed Area for curb and sidewalk placement has been cleared out, graded to plan specifications, and will be tested for densities on Monday morning.
07/10/2025 TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork Passed Utility sleeves for fiber optic and electricity still needs to be trenched and installed. After speaking with the super, Bradley, the work is supposed to be done today or tomorrow. No PIA work being done today.