Permit: TR-PIA-0424-00007

Parcel: 13817038A


Addresses:

480 E ELVADO RD

Inspection Status: Canceled

Inspection History: TRSP - PIA - Roadway Subgrade

Date Description Inspector Results Comments
06/12/2026 TRSP - PIA - Roadway Subgrade Canceled
08/19/2025 TRSP - PIA - Roadway Subgrade Passed JudCo is backfilling a few areas to allow neighbors to access driveways and front of homes. He is currently using recycled AB; I took a proctor yesterday to the lab for measuring optimum density and moisture. Compaction efforts so far involve sheep's foot on a detachable track excavator, jumping jack, and high end plate tamper.
08/27/2025 TRSP - PIA - Roadway Subgrade Passed Initial density tests of roadway PAG AB came back with good moisture content and 100% compaction.
09/16/2025 TRSP - PIA - Roadway Subgrade Passed Densities and string line were on point per specifications. Tested AB came in at >100%; I walked the entire stretch with the super and measured the AB, and it all landed within a specs.
11/18/2025 TRSP - PIA - Roadway Subgrade Passed Density test was taken at station 14+60 and resulted in a passed test >95%. The test was taken at 6". String lining is not ready yet due to the trench still being finished and shall be within the next couple of weeks.
11/21/2025 TRSP - PIA - Roadway Subgrade Passed AB grading for subgrade prior to paving has begun starting at the intersection of Elvado and Geronimo. The existing roadway has been milled and removed, and roadway AB is being used to grade.
12/29/2025 TRSP - PIA - Roadway Subgrade Passed Subgrade was tested at >95% just E of new transverse grate approximately at station 19+30.