Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TR-PIA-0424-00007

Parcel: 13817038A


Addresses:

480 E ELVADO RD

Inspection Status: Passed

Inspection History: TRSP - PIA - Barricade - Setup/Takedown/Routine

Date Description Inspector Results Comments
02/09/2026 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed All traffic control has been removed from the site. Team is working on items from check list and should be finishing soon. The neighborhood's traffic is back to normal conditions.
02/11/2026 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed Traffic control has been taken down. Also, the handrail is still being installed on site where the catch basin is feet from Nogales Hwy along Elvado.
06/12/2026 TRSP - PIA - Barricade - Setup/Takedown/Routine Canceled
07/08/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed Traffic control is up and following plan. Geronimo is closed due to water line trenching at intersection with Elvado.
07/10/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed Street is closed between 6th Ave and Nogales Hwy. Traffic control is placed according to plan.
07/15/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed Traffic control is in good shape even though neighbors in the area have been taking down or moving signs probably to bring larger vehicles in and out.
07/21/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed Sent email and spoke with Colby Frayer on site about concerns with traffic control plan including some damaged road closed signs and temporary fencing that is not keeping traffic out in trenched areas.
07/22/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed Temporary orange fencing is still around trenching area. During my visit at 12:30 PM, nobody was on site and two areas were open at about 2-3 feet in depth. The only barrier between the trenches and walkways is the orange temporary fencing. I highly suggest chain link fencing due to the amount of children and pedestrians in the area as well as blatant motorists disregard of construction signage. Lastly, the road closed sign at the intersection of 6th and Elvado is damaged beyond the ability to stand; therefore, it should be replaced.
08/07/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed Traffic control devices are in good shape, reflective, and have lights on all pieces of equipment. The street is closed off of Elvado and 6th Ave. There is plenty of vertical panels, type 2, and type 3 signage to indicate to traffic the flow of traffic.
08/19/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed All traffic control is looking good even though there is a fair amount of traffic in the area. The homeowners are being more respectful of the work and signage.
09/02/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed Overall, traffic control plan is in good shape. Areas that need to have road closures are designated with Road Closed signs. Other areas are open for neighborhood traffic to be able to access. All signs are in good reflective shape as well as have lights to for nighttime visibility.
09/23/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed Spoke with Jud regarding current TCP and how he needs to contact Quail ASAP to get a new plan as they focus all of their efforts between the E side of Geronimo along Elvado heading toward Nogales Hwy. I told him to tell Quail that I was looking at shutting down the site due to the number of inconsistencies with the set up and the plan. He assured me he would be contacting Quail immediately.
09/29/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed A new traffic control plan has been proposed but has not been implemented as of today. The new plan was sent in on Friday, and today is Monday. It may take a couple of days for the new plan to be redesigned.
10/17/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed Traffic control is a lot more manageable since it has recently changed. All signs are up and in place according to the new plan.
10/27/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed Now that the traffic control plan is a lot less than the one before, the signs have stayed up, are accurate, and staying in place. The working site is flowing nicely without having to worry about signs being littered throughout.
11/07/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed Traffic control signage is up and in good condition. It is a smaller site, so the team is doing a better job of keeping the signs up and according to the plan.
12/01/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed
12/11/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed Traffic control is per plan and looking good. All signs are clear, visible, and reflective.
12/22/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed Traffic control is doing well and up per approved TCP. Signs are holding up over time.