Inspection Status: Not Ready
Inspection History: TRSP - PIA - Curb Placement
| Date |
Description |
Inspector |
Results |
Comments |
| 01/28/2026 |
TRSP - PIA - Curb Placement |
|
Not Ready |
|
| 02/03/2026 |
TRSP - PIA - Curb Placement |
|
Passed |
This is for pre-pour and preform of the curb and gutter inspection to verify everything looks to be correct see also attached photos there is still more curb to be poured I will pass this inspection and then do another curb inspection on the next pour |
| 02/04/2026 |
TRSP - PIA - Curb Placement |
|
Passed |
there will be another pour for some more curb and driveway removal after they get this in and the new driveway so they still have access once this is poured they will enter at a new access point. They currently still have to set up for their guttersand scuppers. |
| 02/06/2026 |
TRSP - PIA - Curb Placement |
|
Passed |
Curb work is being completed, and then they have to rip out some more curb and change the entrance point |
| 04/08/2026 |
TRSP - PIA - Curb Placement |
|
Passed |
|
| 04/27/2026 |
TRSP - PIA - Curb Placement |
|
Passed |
|
| 04/27/2026 |
TRSP - PIA - Curb Placement |
|
Passed |
All work complete for the right of way and PIA |