Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Deferred

Inspection History: TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork

Date Description Inspector Results Comments
08/11/2026 TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork Deferred
09/15/2025 TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork Passed Had a in person preconstruction meeting with myself, staff from , and Dan. During the meeting traffic control revision was discussed as well as concrete and asphalt submittals. A question was asked if PG 76–10 would be allowable because less than 100 tons will be used, but both AC mixes will be submitted anyways.
TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork Passed Today I collected a sample of native soil to be tested by the city of Tucson laboratory to determine density and moisture proctor for the native soil of this project. I collected a 5 gallon buckets worth of soil.
09/19/2025 TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork Passed The fence has been moved back to where the new right of way will be. All of the vegetation has been cleared in the new right of way. The sawcut has been completed along Bear Creek Canyon but the demo and remove all of the excess asphalt has not occurred. Survey was supposed to be out today but got delayed until next week.