Parcel: 13811054E


Addresses:

6358 S FONTANA AV


Inspection Status: Passed

Inspection History: TRSP - PIA - Barricade - Setup/Takedown/Routine

Permit Number - TR-PIA-0224-00001

Inspection Description - TRSP - PIA - Barricade - Setup/Takedown/Routine

Inspection Status - Passed

Date Description Inspector Results Comments
07/15/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed
07/16/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed Rain no work
07/17/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed
07/22/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed
07/23/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed
07/28/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed
08/07/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed
08/08/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed
08/18/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed No work on site today, no traffic control set up either.
08/27/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed Type one barricades with caution tape are being used at the entrance to the subdivision on Fontana because paving operations will be happening in the next day and there is a lip at the entrance
09/02/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed No work on site today
09/10/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed Today the crews are raising the man hole rims and finishing the concrete around them. The foundations for the walls have also been poured and the blocks are staged in various locations. The ground work has been prepared for the remainder of the sidewalk and last ADA ramp. It has not been formed up yet.
09/19/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed No work on site today. Still waiting on the last ADA ramp to be formed up. Haven't started the retaining wall on the south side yet.
10/01/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed Update to Fontana Estates. The small retaining wall has been erected on the south side of the road and the normal block wall has been erected on the north side of the road see pictures the ADA ramp has yet to be formed up or poured at the south west corner.
10/07/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed No work on site today. Still waiting on both ADA ramps and the chunk of sidewalk on the southside. Still waiting for the asphalt to be removed and the concrete valley gutter to be formed and poured.
10/31/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed All traffic control has been removed from Fontana. All sidewalk has been poured, both ADA ramps have been poured, and the concrete valley gutter has been poured. There is nothing left that pertains to PIA that needs to be completed.
12/10/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed This site has reached the final stage and no longer needs this inspection.