Inspection Status: Passed
Inspection History: TRSP - PIA - Pre-Paving Meeting/Inspection
| Date |
Description |
Inspector |
Results |
Comments |
| 08/28/2025 |
TRSP - PIA - Pre-Paving Meeting/Inspection |
|
Passed |
Paving took place today at Fontana, both the QC and QA sampled at the same time and rolling pattern was established by the QC. The total tons for the whole project was 368.22. |