Inspection Status: Re-inspection required
Inspection History: TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour)
| Date |
Description |
Inspector |
Results |
Comments |
| 05/22/2026 |
TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) |
|
Re-inspection required |
expansion joints and forms are ok, subgrade has been impacted by outside work. Please have these resolved before pouring concrete. |
| 05/29/2026 |
TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) |
|
Re-inspection required |
Subgrade not ready, forms out of alignment |
| 06/02/2026 |
TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) |
|
Passed |
safety caps and expansion joints in place, subgrade compaction and depth checked, verified, and uniform, approved |