Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: TRSP - ROW - Concrete - Acceptance (Post-Pour)
| Date |
Description |
Inspector |
Results |
Comments |
| 01/16/2025 |
TRSP - ROW - Concrete - Acceptance (Post-Pour)
|
|
Passed |
panel corrected, grades and joints checked and approved |
| 09/06/2024 |
TRSP - ROW - Concrete - Acceptance (Post-Pour)
|
|
Re-inspection required |
remove and replace most southern panel, free of ridges and pores |
| 10/23/2024 |
TRSP - ROW - Concrete - Acceptance (Post-Pour)
|
|
Re-inspection required |
Out of spec panel not replaced |
| 11/19/2024 |
TRSP - ROW - Concrete - Acceptance (Post-Pour)
|
|
Not Ready |
awaiting fixes on third panel to the left of the driveway apron |