Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: TRSP - ROW - Concrete - Acceptance (Post-Pour)
| Date |
Description |
Inspector |
Results |
Comments |
| 03/06/2025 |
TRSP - ROW - Concrete - Acceptance (Post-Pour)
|
|
Re-inspection required |
Sidewalk and driveway have not been poured yet |
| 05/12/2025 |
TRSP - ROW - Concrete - Acceptance (Post-Pour)
|
|
Passed |
Sidewalk and driveway are constructed in accordance with COT standards. |