Inspection Status: Passed
Inspection History: TRSP - ROW - Concrete - Acceptance (Post-Pour)
| Date |
Description |
Inspector |
Results |
Comments |
| 01/27/2025 |
TRSP - ROW - Concrete - Acceptance (Post-Pour)
|
|
Passed |
out of spec panels have been corrected, checked and approved |
| 08/19/2024 |
TRSP - ROW - Concrete - Acceptance (Post-Pour)
|
|
Re-inspection required |
two panels in apron of of spec on cross slope. slope is 2.4%. slope may not exceed 2.0%. will notify contractor |
| 10/23/2024 |
TRSP - ROW - Concrete - Acceptance (Post-Pour)
|
|
Re-inspection required |
out of spec panels have not been replaced |
| 11/19/2024 |
TRSP - ROW - Concrete - Acceptance (Post-Pour)
|
|
Re-inspection required |
out of spec panels in driveway, apron have not yet been replaced |