Inspection Status: Passed

Inspection History: TRSP - ROW - Concrete - Acceptance (Post-Pour)

Date Description Inspector Results Comments
01/27/2025 TRSP - ROW - Concrete - Acceptance (Post-Pour) Passed out of spec panels have been corrected, checked and approved
08/19/2024 TRSP - ROW - Concrete - Acceptance (Post-Pour) Re-inspection required two panels in apron of of spec on cross slope. slope is 2.4%. slope may not exceed 2.0%. will notify contractor
10/23/2024 TRSP - ROW - Concrete - Acceptance (Post-Pour) Re-inspection required out of spec panels have not been replaced
11/19/2024 TRSP - ROW - Concrete - Acceptance (Post-Pour) Re-inspection required out of spec panels in driveway, apron have not yet been replaced