Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: TRSP - ROW - Concrete - Acceptance (Post-Pour)
| Date |
Description |
Inspector |
Results |
Comments |
| 05/20/2026 |
TRSP - ROW - Concrete - Acceptance (Post-Pour)
|
|
Not Ready |
awaiting pre pour status from applicant |
| 06/01/2026 |
TRSP - ROW - Concrete - Acceptance (Post-Pour)
|
|
Re-inspection required |
three sidewalk panels have damage. Southernmost apron panel has cracked, sidewalk panel second south from apron has machine scrapes, third panel south of apron has crack on its corner. All have been marked with pink paint. |
| 06/19/2026 |
TRSP - ROW - Concrete - Acceptance (Post-Pour)
|
|
Passed |
three out of spec panels have been replaced, checked and verified, approved |