Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - FOPR - Structure (eg stages, installations, framing, air supported structures)
| Date |
Description |
Inspector |
Results |
Comments |
| 06/22/2023 |
COT - FOPR - Structure (eg stages, installations, framing, air supported structures) |
|
Re-inspection required |
Tent not up as of 6/22. |
| 06/26/2023 |
COT - FOPR - Structure (eg stages, installations, framing, air supported structures) |
|
Re-inspection required |
|
| 06/28/2023 |
COT - FOPR - Structure (eg stages, installations, framing, air supported structures) |
|
Passed |
Tent was not exactly as indicated on the documents. There were more stakes but the ratchet straps seem smaller than two inches. Tent did not have visible flame resistant tab anywhere. |