Inspection Status: Partial Pass
Inspection History: COT - FOPR - Structure (eg stages, installations, framing, air supported structures)
| Date |
Description |
Inspector |
Results |
Comments |
| 06/24/2024 |
COT - FOPR - Structure (eg stages, installations, framing, air supported structures) |
|
Partial Pass |
Tent was staked, however not double staked at the corners. Had four sidewalls, appeared to have an exit sign and no smoking sign inside from what I could see. One of the North side ratchet straps was loose. |
| 06/27/2024 |
COT - FOPR - Structure (eg stages, installations, framing, air supported structures) |
|
Passed |
|