Inspection History Details
Inspection Status: Not Ready
Inspection History: FCON – OH Piping & Hydro
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| FCON – OH Piping & Hydro | Not Ready | Not ready per contractor. | ||
| 01/17/2023 | FCON – OH Piping & Hydro | Passed | verify correct meter at final. 65psi |