Permit: TF-FCP-1025-00936

Parcel: 11504508C


Addresses:

812 E SPEEDWAY BL

Inspection Status: Not Ready

Inspection History: FCON – OH Piping & Hydro

Date Description Inspector Results Comments
FCON – OH Piping & Hydro Not Ready
05/01/2026 FCON – OH Piping & Hydro Partial Pass 2nd floor South/East system denied did not hold pressure, 2nd floor North and South/west system approved, 2nd floor North/East system approved.
05/06/2026 FCON – OH Piping & Hydro Partial Pass OH/Hydro for SE corner of 2nd Floor.
05/15/2026 FCON – OH Piping & Hydro Partial Pass 3rd floor: South system denied low pressure and mutiple leakers, East system denied low pressure and mutiple leakers, West system approved.
05/29/2026 FCON – OH Piping & Hydro Partial Pass East system denied room 355 multiple leakers, room 354 leaker, south system approved.
06/23/2026 FCON – OH Piping & Hydro Partial Pass OH/Hydro for 5th floor. 210psi.
07/14/2026 FCON – OH Piping & Hydro Partial Pass Ok for OH/Hydro for 6th Floor. 205psi.
07/23/2026 FCON – OH Piping & Hydro Partial Pass half of the 7th floor approved.
07/27/2026 FCON – OH Piping & Hydro Partial Pass 2nd half of the 7th floor 200 lbs test approved.
FCON – OH Piping & Hydro Requested
04/28/2026 FCON – OH Piping & Hydro Partial Pass Ok for OH/Hydro for Basement and 1st Floor except SE corner.
06/08/2026 FCON – OH Piping & Hydro Partial Pass OH/Hydro for 4th floor. 205psi.