Inspection History Details
Inspection Status: Passed
Inspection History: FCON – OH Piping & Hydro
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/11/2023 | FCON – OH Piping & Hydro | Passed | 220 psi. P2F ensure uprights not obstrucyed by ducts. ensure vent installed on NW corner of system. | |
| 02/17/2023 | FCON – OH Piping & Hydro | Passed |