Inspection Status: Partial Pass
Inspection History: FCON – OH Piping & Hydro
| Date |
Description |
Inspector |
Results |
Comments |
| 09/24/2025 |
FCON – OH Piping & Hydro |
|
Partial Pass |
OH/Hydro for 4th Floor. 215psi. |
| 12/24/2025 |
FCON – OH Piping & Hydro |
|
Partial Pass |
OH/Hydro for 7th floor. |
| 12/19/2025 |
FCON – OH Piping & Hydro |
|
Re-inspection required |
5th floor, 210 psi however all of the units were completely drywalled and unable to inspect overhead piping. |
| 04/22/2026 |
FCON – OH Piping & Hydro |
|
Deferred |
|
|
FCON – OH Piping & Hydro |
|
Not Ready |
3rd Floor had a leak, not holding pressure. |