Inspection Status: Partial Pass
Inspection History: FCON – OH Piping & Hydro
| Date |
Description |
Inspector |
Results |
Comments |
| 09/19/2023 |
FCON – OH Piping & Hydro |
|
Partial Pass |
Was unable to see overhead piping because the drywall was already hung. Cutler Fire Protection to submit Contractor's Material Test Certificate for Aboveground Piping. |
| 09/20/2023 |
FCON – OH Piping & Hydro |
|
Passed |