Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: FCON – OH Piping & Hydro
Permit Number - TF-FCP-0823-00921
Inspection Description - FCON – OH Piping & Hydro
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/04/2023 | FCON – OH Piping & Hydro | Partial Pass | 3 Heads up against roof joist east end of building, 3 upright heads missing in the east end of building, several heads still have the shipping plastic on them. | |
| 06/24/2024 | FCON – OH Piping & Hydro | Re-inspection required | Head needs to be added to the riser room, suit 161 has a plastic collar on one of the upright heads. | |
| 06/26/2024 | FCON – OH Piping & Hydro | Passed |