Inspection Status: Partial Pass

Inspection History: FCON – OH Piping & Hydro

Date Description Inspector Results Comments
01/15/2026 FCON – OH Piping & Hydro Partial Pass Need heads in IDF room, customer service, main entrance, aquarium, roll up door, and riser room. 4 way braces on risers.
01/13/2026 FCON – OH Piping & Hydro Re-inspection required East system not holding pressure. Need to verify pressure test on all second floor heads. West system pressure test approved first floor, missing several hangers. South system O&H first floor approved
03/17/2026 FCON – OH Piping & Hydro Passed