Inspection History Details
Inspection Status: Passed
Inspection History: FCON – OH Piping & Hydro
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/01/2025 | FCON – OH Piping & Hydro | Passed | Inspection was done the same day as building 5 inspection. |
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/01/2025 | FCON – OH Piping & Hydro | Passed | Inspection was done the same day as building 5 inspection. |