Inspection History Details
Inspection Status: Partial Pass
Inspection History: FCON – OH Piping & Hydro
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/16/2025 | FCON – OH Piping & Hydro | Partial Pass | Suite 160 still needs pressure test. | |
| 06/11/2025 | FCON – OH Piping & Hydro | Passed |