Inspection Status: Not Ready
Inspection History: FCON – OH Piping & Hydro
| Date |
Description |
Inspector |
Results |
Comments |
|
FCON – OH Piping & Hydro |
|
Not Ready |
|
| 04/19/2024 |
FCON – OH Piping & Hydro |
|
Partial Pass |
4th floor only is approved. |
| 04/25/2024 |
FCON – OH Piping & Hydro |
|
Partial Pass |
3rd floor approved. |
| 06/06/2024 |
FCON – OH Piping & Hydro |
|
Partial Pass |
Heads in the elevator hoistway still need to be connected to the system. |
| 06/28/2024 |
FCON – OH Piping & Hydro |
|
Passed |
220 psi |
| 05/23/2024 |
FCON – OH Piping & Hydro |
|
Partial Pass |
2nd floor approved |