Inspection History Details
Inspection Status: Passed
Inspection History: FCON – OH Piping & Hydro
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/21/2023 | FCON – OH Piping & Hydro | Passed | ||
| 04/19/2023 | FCON – OH Piping & Hydro | Re-inspection required | Missimg head in 1st floor bedroom |