Inspection History Details
Inspection Status: Basin - Fair
Inspection History: COT - BASN - Drainage/Basin - Annual Inspection - Recur
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/09/2023 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | All basins are under construction and are fair condition. | |
| 02/22/2024 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | No basin has been cut in this area as of yet. Stakes set for entrance into,area off of Camino Boleadoras but no grade work yet. | |
| 04/24/2024 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | grass on side walls of basin is dying, needs to be rectified for longevity of this basin | |
| 12/12/2024 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | Northern basin: hydro seed hasn’t taken yet, no grass. Southern basin: under construction. |