Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Basin - Good
Inspection History: COT - BASN - Drainage/Basin - Annual Inspection - Recur
| Date |
Description |
Inspector |
Results |
Comments |
| 03/21/2024 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Good |
Site is at blue top grading stage and (2) basins have been cut at the North front of site. |
| 01/30/2024 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
Project is under construction. No activity on site at this time. |
| 03/20/2025 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
Basin under construction. Pictures attached. Lot that basin is located in is under construction with new duplexes. The Basin Side slope does not yet have any erosion control measure. It has recently been graded and a sidewalk scupper has been installed. |
| 07/27/2023 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
not constructed at this re inspect in six months. |