Inspection History: COT - ENGR - Site - Assurance Release

Date Description Inspector Results Comments
05/11/2026 COT - ENGR - Site - Assurance Release Passed All common sidewalks, survey monuments and curbs are installed. ADA ramps are installed. Required Drainage improvements are installed. Electric, Water system, Sanitary Sewer, and Hydrants are in. Street signs are installed. Hand rail fixed at lots 112-113. Damaged sidewalk panels on Harkes and Keller Lane repaired. Common Areas A and B complete.
06/18/2025 COT - ENGR - Site - Assurance Release Not Ready Hand Railing has been damaged between lots 112 and 113 on E Friedel Drive. Embed plates are displaced from sidewalk at entry into common area. This needs to be repaired.
Common sidewalk panels near Northwest corner of E Harkes and N Keller lane are damaged. This needs to be repaired before Assurance Release.
09/06/2024 COT - ENGR - Site - Assurance Release Passed Partial Release Lot's, 1-14, 106-108, 124-208, 47%