Inspection History Details
Inspection Status: Passed
Inspection History
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/12/2026 | Passed | Basin at SE and NW have been roughed in, locations are good, plan is to over-ex basin floors and bring up to finish elevation towards the end of project. Benchmarks are in place. |