Inspection Status: Partial Pass
Inspection History: Consultation SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 02/03/2026 |
Consultation SITE |
|
Partial Pass |
contractors gonna have Tucson asphalt come out here and repair the walkway path in areas that have come apart. Contractor informed me that Tucson asphalt is going to put the fines in the asphalt and then reseal it. |
| 02/11/2026 |
Consultation SITE |
|
Partial Pass |
The consultation with the contractor was about removing the silk fence along Craycroft and Glenn. I informed him that when they get ready to remove it to give us a call. |
| 05/19/2026 |
Consultation SITE |
|
Partial Pass |
contractor wanted some information on the Hydro seed the heat place on the west side of the project. Everything looks good over there. I informed him not to be driving over it. |
| 06/17/2025 |
Consultation SITE |
|
Canceled |
|
| 07/30/2025 |
Consultation SITE |
|
Passed |
Consultation was on the drainage pipe. Set the standards for how we want to see it, trench, bed, set pipe. Shade if needed so we can get a level on the pipe, backfill after this is completed. Schedule 1 bedding. |
| 12/17/2025 |
Consultation SITE |
|
Not Ready |
Gates lock nobody on site |