Inspection History Details
Inspection Status: Partial Pass
Inspection History
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/02/2026 | Partial Pass | Site wall at southeast corner: excavation dimensions and reinforcement are correct, okay to pour footer. Two (2) monument sign bases: excavation dimensions and reinforcement are correct, okay to pour footer. |
||
| 03/04/2026 | Partial Pass | Seat walls at NE corner of site (walking path round-a-bout) footing location, dimensions, and reinforcement are good; okay to pour. | ||
| 03/16/2026 | Not Ready | Not ready for inspection today, will reschedule for tomorrow. | ||
| 03/17/2026 | Partial Pass | Refuse enclosure is okay to grout first lift. Screen wall in SE corner, okay to grout first 3 segments of wall. |
||
| 03/19/2026 | Partial Pass | Site walls at SE corner: stacked to height (~4ft), reinforcement is good, okay to grout. 2 monument signs: stacked to height (~5ft), reinforcement is good, okay to grout. Seat wall: base is in place with reinforcement, okay to grout. |