Inspection Status: Partial Pass
Inspection History
Permit Number - TD-DEV-1224-00336
Inspection Description -
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/05/2025 | Partial Pass | Contractor installing 12 inch 8DPE 200 legal feet and eight laterals at 4 inch HDPE they’re good to backfill. Inform the contractor to compaction test and have them on site at all times. | ||
| 08/28/2025 | Partial Pass | contractor installed 4 inch conduit for electrical good to backfield the contractor that some density test for the trench backfill . Also informed the contractor that they need to keep Glenn Street clean. |