Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 12/19/2024 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
I informed the contractor that we needed all third-party testing starting as January one 2025. Contractor needs to install wattles on the south side of the project. Calling for inspection for swap inspection stormwater inspections, biweekly. |