Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Paving
Permit Number - TD-DEV-1223-00489
Inspection Description - ENGR Paving
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/07/2025 | ENGR Paving | Not Ready | Bollards placement needs to be verified | |
| 05/12/2025 | ENGR Paving | Partial Pass | 5/12/25. PCCP under Drive through. GC at risk for work because of State hold due to insufficient permits. The rest of the site is not ready no ABC. See Checklist items for details. | |
| 05/15/2025 | ENGR Paving | Not Ready | Contractor will call in for another inspection for AB tomorrow morning. | |
| 05/19/2025 | ENGR Paving | Partial Pass | Contractors good to pay the parking lot area | |
| 06/03/2025 | ENGR Paving | Partial Pass | I observed contractor repair/repave area in partially milled area. Tack coat was applied to milled surfaces. Asphalt temperatures were acceptable. Sample was taken by 3rd party. See checklist items for details. |
|
| 08/04/2025 | ENGR Paving | Passed |