Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Date Description Inspector Results Comments
05/16/2024 PDSD Engineering Division Pre-Construction SITE Passed Met with the contractor and discussed the NPPO requirements, and asked them to contact us when they start work on the NPPO items. Also have advised them to schedule the Stormwater Follow-up Inspection every 2 weeks to ensure they are doing what they need to do. They have also been reminded that there should be a SWPPP for this site that needs to be implemented, this will include Sit Posting and Track-out Rock placement per the approved plan as well as BMT's.