Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 05/16/2024 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
Met with the contractor and discussed the NPPO requirements, and asked them to contact us when they start work on the NPPO items. Also have advised them to schedule the Stormwater Follow-up Inspection every 2 weeks to ensure they are doing what they need to do. They have also been reminded that there should be a SWPPP for this site that needs to be implemented, this will include Sit Posting and Track-out Rock placement per the approved plan as well as BMT's. |