Inspection Status: Partial Pass
Inspection History: For trash and recycling enclosures
| Date |
Description |
Inspector |
Results |
Comments |
| 07/10/2025 |
For trash and recycling enclosures |
|
Partial Pass |
Vertical and horizontal reinforcement are accurate. Okay to grout first lift. Additional bollards will be needed on the sides of the enclosure per approved plan detail. |
| 07/11/2025 |
For trash and recycling enclosures |
|
Partial Pass |
Vertical and horizontal reinforcement is good, bond beam in place. Okay to grout to top. |
| 07/30/2025 |
For trash and recycling enclosures |
|
Partial Pass |
Rebar spacing, size, and clearance is good. Slab thickness and slope is good. Okay to pour slab within enclosure, approach will be done at a later date. |