Inspection History Details
Inspection Status: Partial Pass
Inspection History: For trash and recycling enclosures
Permit Number - TD-DEV-1124-00308
Inspection Description - For trash and recycling enclosures
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/10/2025 | For trash and recycling enclosures | Partial Pass | Vertical and horizontal reinforcement are accurate. Okay to grout first lift. Additional bollards will be needed on the sides of the enclosure per approved plan detail. | |
| 07/11/2025 | For trash and recycling enclosures | Partial Pass | Vertical and horizontal reinforcement is good, bond beam in place. Okay to grout to top. | |
| 07/30/2025 | For trash and recycling enclosures | Partial Pass | Rebar spacing, size, and clearance is good. Slab thickness and slope is good. Okay to pour slab within enclosure, approach will be done at a later date. |