Inspection History Details
Inspection Status: Partial Pass
Inspection History
Permit Number - TD-DEV-1124-00308
Inspection Description -
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/28/2025 | Partial Pass | Curb forms are accurate to plan set, okay to pour. Trash enclosure bollards are placed properly and to the necessary depth, okay to pour. |
||
| 07/30/2025 | Partial Pass | Sidewalk layout for main entrance was discussed, there will be a curb ramp the length of the opening leading up to the front of the building, slopes will be maintained at less than 8.3% for the ramps and less then 2% everywhere else to avoid cross slope conflicts. Ramps will need truncated domes or saw cuts as a form of detectable warning. Delete two curbs from the plans that were interfering with pedestrian access. | ||
| 08/05/2025 | Partial Pass | Retaining wall at rear of building: footing size and reinforcement is good on the West half of the wall. | ||
| 08/06/2025 | Partial Pass | Retaining wall along North of building: size, depth, and reinforcement is correct. Okay to pour footing for all sections where rebar is installed. | ||
| 08/15/2025 | Partial Pass | Sub-grade is good. Forms are correct, okay to pour V-ditch in Northern most drive path. | ||
| 08/21/2025 | Partial Pass | Remaining section of retaining wall has been poured and curbing at West end of building D is complete per plans. Sub-grade is ready for valley gutter to be formed on West side of project. |