Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/12/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | Pre-Construction meeting held on site with superintendent. Primary inspections for this site are as follows: Refuse enclosure: dumpster structure's footing, bollards, apron, floor, wall pre-grout Sidewalk/flatwork: sidewalks and concrete driveway Drainage structure: Valley gutter Paving: Sub-grade, AB, and Asphalt Striping: parking stripes, ADA signs, bike loops, crosswalks Water harvesting: rainwater basin Landscape/Irrigation: root barriers, finished plantings, ground cover, irrigation function Site consultation: general site visit for any questions Engineering Final/Zoning Final: Once work is complete and site is finished |