Inspection History Details
Inspection Status: Partial Pass
Inspection History: SITE - Sign Footer/Setback/Excavation Layout/Rebar
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/20/2026 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | Partial Pass | Refuse enclosure wall: plan is to stack to full height (6 ft), provide weep holes, and grout in a single lift. Wall is currently at 4 ft with bond beams at 2 ft and 4 ft. Okay to stack to 6 ft. Porch columns: max grout lift is 64", call inspection prior to grout. |
|
| 07/21/2026 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | Partial Pass | Refuse enclosure: reinforcing bar is good, weep holes are in place. Okay to grout full height. Patio columns on north side: block is stacked to 64", reinforcement is good. Okay to grout three (3) columns to 64". |