Inspection History Details
Inspection Status: Canceled
Inspection History: ENGR - Drainage Structures
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/18/2024 | ENGR - Drainage Structures | Canceled | Plans are in hand and will be turned into Dave Roberts. Inspection can be recalled after the plan review is completed and implemented by the contractor on site. | |
| 07/01/2024 | ENGR - Drainage Structures | Partial Pass | KENG continuing with the basin repairs. Contractor will call in when they finish installing the pipes the pipes. | |
| 10/24/2024 | ENGR - Drainage Structures | Passed | East side looks great, request rock socks be installed along road way to stop sediment from entering the basin. Also west side basin needs work especially in the south west corner. |