Inspection History Details
Inspection Status: Passed
Inspection History: NPPO Pre-Construction
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/06/2025 | NPPO Pre-Construction | Passed | No native plants are being disturbed for this project. Contractor will be mindful to protect existing trees and saguaros within limits of work. |