Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 02/18/2025 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
Pre-Con has been completed, handouts have been given to the site super. Storm water plan should be revised to show wattle and or sediment log. Sediment log is being used vs. silt fence. Please schedule your stormwater initial for 02/19/25. |