Inspection History Details
Inspection Status: Partial Pass
Inspection History
Permit Number - TD-DEV-1123-00451
Inspection Description -
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/30/2025 | Partial Pass | We will check forms again when ready before pour on Wednesday 6/4/25. | ||
| 06/03/2025 | Partial Pass | Truncated domes will fit inside curb ramps to match PAG Detail 207. The other ramp landings are scored. Forms and poured ramps/landings are correct. | ||
| 07/07/2025 | Partial Pass | 7/7/25 Scupper and Curb ramp in checklist need to be repaired. See details. Electrical conduit to drive through menu boards must have minimum 18”. Need to be comply at footers. I noticed the Landscapers were putting down the dg without correct depth at basins 13 and 14. I talked to GC about the need to correct the basin bottoms so the bottoms typically were below the pavement. The DG then slopes up to the back of the curb to the elevation of the top of curb. Call in rebar/footer inspection for screen walls if they will be built. As built will be needed if changed. |
||
| 07/14/2025 | Passed |