Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Paving
Permit Number - TD-DEV-1123-00451
Inspection Description - ENGR Paving
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/07/2025 | ENGR Paving | Not Ready | 7/7/25 Paving will take place starting 7/10. Blue tops are in place. Asphalt joint to existing private road between curb ramps need to comply with a running slope less than 5% and a cross slopes less than 2%. | |
| 07/09/2025 | ENGR Paving | Partial Pass | See checklist items for details. | |
| 07/14/2025 | ENGR Paving | Passed |