Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: ENGR - Drainage Structures
| Date |
Description |
Inspector |
Results |
Comments |
| 01/13/2025 |
ENGR - Drainage Structures |
|
Passed |
All piers have been inspected and pass, bonding/grounding has been done in all riser areas by means of a #2 bare copper ground attached to a 5/8' x 10' grounding rod started approximately 2' below asphalt and angled into the side of the excavation. |