Inspection History Details
Inspection Status: Partial Pass
Inspection History
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/19/2024 | Partial Pass | Complete the asphalt place around the boards on the east side of the building and provide the revised drawings for the handicap parkingspace and access aisle. This site is OK for level four TCO at this time but not for the final. |