Inspection History Details
Inspection Status: Not Ready
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/09/2025 | PDSD Engineering Division Pre-Construction SITE | Not Ready | Contractor does not have permit or approved DP on site. Work has begun on site. Rebar for pad is in place. Please reschedule Pre-Construction meeting ASAP. |
|
| 09/04/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | Get Survey prior to site grading and construction. Inspections needed: Handout provided. grading- initial, progress and final paving refuse enclosure signage striping landscaping Flatwork for sidewalk/ramps/curbs ENGR Final. |