Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 02/08/2024 |
ENGR Engineering Final
|
|
Passed |
|
| 07/14/2023 |
ENGR Engineering Final
|
|
Partial Pass |
|
| 07/18/2023 |
ENGR Engineering Final
|
|
Not Ready |
Corey. Some grading, landscaping and rainwater, piping and splash blocks remain to be completed at this time |
| 09/06/2023 |
ENGR Engineering Final
|
|
Partial Pass |
Need to recall inspection after swale and rip rap is completed on SW corner of garage area from mini split unit to finish grade and NE corner of garage down to finish grade. |