Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
| Date |
Description |
Inspector |
Results |
Comments |
| 07/12/2023 |
ENGR - Drainage Structures |
|
Partial Pass |
Contractor poured footers for the trash, enclosures building, inspector, inspect the footers and the rebar. I took a second look at it and everything looks good. |
| 07/20/2023 |
ENGR - Drainage Structures |
|
Partial Pass |
Contractor shut the steel for the trash, enclosures, good decor for grout |
| 08/02/2023 |
ENGR - Drainage Structures |
|
Partial Pass |
Contractor knocked out to grab hold on in the trash or closures to expose the rebar |
| 08/09/2023 |
ENGR - Drainage Structures |
|
Partial Pass |
Contractor set the steel for the floor for the trash enclosure. Good to pour. |
| 09/11/2023 |
ENGR - Drainage Structures |
|
Partial Pass |
City Of Tucson did not inspect any of the footers for the columns . I informed the contractor that he would have to get the engineer of record to certified the steel and the footers for the columns. |
| 11/08/2023 |
ENGR - Drainage Structures |
|
Passed |
|