Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 03/27/2026 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
Meeting held over the phone. This project is mostly complete already. Pedestrian circulation between the trailer and the building has been blocked. This needs to be corrected prior to calling in for final inspection. |